{"id":1105,"date":"2022-05-12T16:57:26","date_gmt":"2022-05-12T14:57:26","guid":{"rendered":"http:\/\/haavind.local\/en\/2022\/05\/12\/norway-sets-ambitious-goals-for-offshore-wind\/"},"modified":"2022-07-21T12:50:44","modified_gmt":"2022-07-21T12:50:44","slug":"norway-sets-ambitious-goals-for-offshore-wind","status":"publish","type":"post","link":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/","title":{"rendered":"Norway sets ambitious goals for offshore wind"},"content":{"rendered":"\t<div class=\"template-post alignwide wp-block-dekode-hero\">\n\t\t<div class=\"hero__inner\">\n\t\t\t<div class=\"hero__inner_blocks\">\n\t\t\t\t<h1 class=\"wp-block-post-title\">Norway sets ambitious goals for offshore wind<\/h1>\n\n<p>Offshore wind licenses representing approx. 1% of Norwegian ocean waters, or 30\u00a0000 MW will be awarded within 2040 announced the Norwegian government in a press conference May 11th. This goal represents nearly a doubling of Norway\u2019s total current renewable energy production and is far beyond the levels of ambitions previously stated by the Government.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<div><\/div>\n\t\t\t\t\t<div class=\"post-meta\">\n\t\t\t\t\t\t<span class=\"info-small\">12 May, 2022 \u00b7 4 min. reading time<\/span>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\n<div class=\"alignleft wp-block-haavind-byline\">\n\t\t\t\t<span class=\"author-tag\">Written by<\/span>\n\t\t\t\t<div class=\"authors\"><a href=\"\" class=\"t2-byline__author-link\">\n\t\t\t\t\t<div class=\"author-inner\">\n\t\t\t\t\t\t<img decoding=\"async\" src=\"\" \/>\n\t\t\t\t\t\t<div>\n\t\t\t\t\t\t<span class=\"name\">Martine Linge Johnsen<\/span>\n\t\t\t\t\t\t<span><\/span>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/a><\/div>\n\t\t\t\t<div class=\"topics\">\n\t\t\t\t<span>Topics<\/span>\n\t\t\t\t<div><a class=\"tag-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/kompetanse\/bransje\/renewable-energy\/\">Renewable energy<\/a><\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\n<p>Offshore wind licenses representing approx. 1% of Norwegian ocean waters, or 30\u00a0000 MW will be awarded within 2040 announced the Norwegian government in a press conference May 11th. This goal represents nearly a doubling of Norway\u2019s total current renewable energy production and is far beyond the levels of ambitions previously stated by the Government.<br \/>\r\n<\/p>\n\n\n<div class=\"wp-block-image\"><figure class=\"alignleft\"><img loading=\"lazy\" decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg\" alt=\"\" class=\"wp-image-1789\" title=\"Row of offshore wind turbines.\" srcset=\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg 1366w, https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind-300x169.jpg 300w, https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind-1024x576.jpg 1024w, https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind-768x432.jpg 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><figcaption>Row of offshore wind turbines.<\/figcaption><\/figure><\/div>\n\n\n<p><strong>Licensing areas<\/strong> \u2013 The government further announced that the next licensing round for new licensing areas will take place in 2025. The government will take a step-by-step approach and new areas will be gradually opened towards 2040. No short-term production or licensing targets are, however, set at this point in time. This to the industry\u2019s frustration.<\/p>\n\n\n\n<p><strong>Grid<\/strong> \u2013 The high production target cannot be handled by the existing Norwegian grid system and is premised on a portion of the production being exported to Europe. This raises, yet again the question of grid, which the government only addressed in part, stating that all types of grid solutions (hybrid, radial to Norway and radial to Europe) will be considered for each of the coming licensing rounds. For the first development of S\u00f8rlige Nordsj\u00f8 II (1500 MW) the government stands by its earlier decision that the produced electricity will be transmitted via subsea cable to the Norwegian mainland only. The industry has unsurprisingly responded that there needs to be further clarification on this point, including Norway\u2019s position on cooperating with other nations in the development of common offshore grid network.<\/p>\n\n\n\n<p><strong>Licensing regime<\/strong> \u2013 the government will also be examining how to increase the efficiency of the licensing regime, specifically considering processing the licensing application and detail plan at the same time. The industry appears pleased with the concrete proposal and more generally reiterates the need for such parallel processes. Haavind sees further opportunities for licensing efficiency and awaits expectantly, alongside the industry, on the finalization of the licensing regime.<\/p>\n\n\n\n<p><strong>Financial<\/strong> \u2013 the introduction of a resource rent tax on offshore wind will also be considered going forward with the aim of ensuring that profits from the industry will benefit Norway as a whole. The government remains otherwise silent about other critical financial regulations (tax regime, mortgage regulations etc.), but stated the additional allocation of 70 MNOK for studies within S\u00f8rlige Nordsj\u00f8 II and Utsira Nord which will be included in the revised national budget which was announced today.<\/p>\n\n\n\n<p>Overall, the announcement does not represent any major shift for the offshore wind industry. It does however set a more ambitious goal and a clearer timeline. In visual terms Norway will go from two to an estimated 1500 turbines in about 20 years, requiring a high tempo for both the state in the awarding of licensing and the industry in developing and completing projects in the near future.<\/p>\n\n\n\n<p>Link to the press release can be found <a href=\"https:\/\/www.regjeringen.no\/no\/aktuelt\/kraftfull-satsing-pa-havvind\/id2912297\/\">here<\/a> (Norwegian only).<\/p>\n\n\t<div \n\t\tclass=\"template-post alignwide wp-block-haavind-block-contact-people\" id=\"contact\"\t\t>\n\t\t<h2 class=\"post-featured-title\">Contact us<\/h2>\n\t\t<div class=\"block-contact-people-list\">\n\t\t\t<div class=\"t2-featured-content-layout alignwide wp-block-t2-featured-content-layout\"><div class=\"t2-featured-single-post t2-featured-content is-post-type-person sector-renewable-energy speciality-energy role-partner wp-block-t2-featured-single-post\">\n<div class=\"wp-block-group alignfull post-featured-image is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/joran-sandvik\/\">\n\t<figure style=\"--t2-focal-point: 50% 50%\" class=\"t2-post-featured-image has-image-ratio-3-4 wp-block-t2-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"795\" height=\"1024\" src=\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2016\/04\/Joran-Sandvik-795x1024.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/><\/figure>\n\t<\/a>\n<\/div>\n\n\n<div class=\"wp-block-group alignfull post-featured-content is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/joran-sandvik\/\"><h2 class=\"t2-post-title wp-block-t2-post-title\">J\u00f8ran Sandvik<\/h2><\/a>\n\t<div class=\"taxonomy-role wp-block-post-terms\"><a href=\"https:\/\/haavind.stage01.dekodes.no\/en\/role\/partner\/\" rel=\"tag\">Partner<\/a><\/div>\n\t<div class=\"card-info wp-block-t2-people-meta\"><div class=\"card-info__post-meta meta-key-people_email\"><a href=\"mailto:j.sandvik@haavind.stage01.dekodes.no\">j.sandvik@haavind.stage01.dekodes.no<\/a><\/div><div class=\"card-info__post-meta meta-key-people_phone\"><a href=\"tel:+47 400 66 700\">+47 400 66 700<\/a><\/div><\/div>\n<\/div>\n\n<\/div>\n<div class=\"t2-featured-single-post t2-featured-content is-post-type-person sector-offshore-and-industries sector-private-equity speciality-construction-and-offshore speciality-corporate speciality-stock-exchange-capital role-partner wp-block-t2-featured-single-post\">\n<div class=\"wp-block-group alignfull post-featured-image is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/baard-sandstad\/\">\n\t<figure style=\"--t2-focal-point: 50% 50%\" class=\"t2-post-featured-image has-image-ratio-3-4 wp-block-t2-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"1030\" src=\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/11\/Bard-Sandstad-2.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/><\/figure>\n\t<\/a>\n<\/div>\n\n\n<div class=\"wp-block-group alignfull post-featured-content is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/baard-sandstad\/\"><h2 class=\"t2-post-title wp-block-t2-post-title\">B\u00e5rd Sandstad<\/h2><\/a>\n\t<div class=\"taxonomy-role wp-block-post-terms\"><a href=\"https:\/\/haavind.stage01.dekodes.no\/en\/role\/partner\/\" rel=\"tag\">Partner<\/a><\/div>\n\t<div class=\"card-info wp-block-t2-people-meta\"><div class=\"card-info__post-meta meta-key-people_email\"><a href=\"mailto:b.sandstad@haavind.stage01.dekodes.no\">b.sandstad@haavind.stage01.dekodes.no<\/a><\/div><div class=\"card-info__post-meta meta-key-people_phone\"><a href=\"tel:+47 932 81 796\">+47 932 81 796<\/a><\/div><\/div>\n<\/div>\n\n<\/div>\n<div class=\"t2-featured-single-post t2-featured-content is-post-type-person sector-renewable-energy speciality-dispute-resolution speciality-energy role-partner wp-block-t2-featured-single-post\">\n<div class=\"wp-block-group alignfull post-featured-image is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/aksel-tannum\/\">\n\t<figure style=\"--t2-focal-point: 50% 50%\" class=\"t2-post-featured-image has-image-ratio-3-4 wp-block-t2-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"795\" height=\"1024\" src=\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2016\/02\/Aksel-Tannunm-795x1024.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/><\/figure>\n\t<\/a>\n<\/div>\n\n\n<div class=\"wp-block-group alignfull post-featured-content is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/aksel-tannum\/\"><h2 class=\"t2-post-title wp-block-t2-post-title\">Aksel S. Tannum<\/h2><\/a>\n\t<div class=\"taxonomy-role wp-block-post-terms\"><a href=\"https:\/\/haavind.stage01.dekodes.no\/en\/role\/partner\/\" rel=\"tag\">Partner<\/a><\/div>\n\t<div class=\"card-info wp-block-t2-people-meta\"><div class=\"card-info__post-meta meta-key-people_email\"><a href=\"mailto:a.tannum@haavind.stage01.dekodes.no\">a.tannum@haavind.stage01.dekodes.no<\/a><\/div><div class=\"card-info__post-meta meta-key-people_phone\"><a href=\"tel:+47 900 22 765\">+47 900 22 765<\/a><\/div><\/div>\n<\/div>\n\n<\/div>\n<div class=\"t2-featured-single-post t2-featured-content is-post-type-person sector-construction sector-fisheries-and-aquaculture sector-offshore-and-industries sector-renewable-energy speciality-construction-and-offshore speciality-corporate speciality-dispute-resolution speciality-offentlige-anskaffelser role-partner wp-block-t2-featured-single-post\">\n<div class=\"wp-block-group alignfull post-featured-image is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/christopher-l-sveen\/\">\n\t<figure style=\"--t2-focal-point: 50% 50%\" class=\"t2-post-featured-image has-image-ratio-3-4 wp-block-t2-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"795\" height=\"1024\" src=\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2017\/01\/Christopher-Sveen-795x1024.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/><\/figure>\n\t<\/a>\n<\/div>\n\n\n<div class=\"wp-block-group alignfull post-featured-content is-layout-flow wp-block-group-is-layout-flow\">\n\t<a class=\"t2-post-link wp-block-t2-post-link\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/people\/christopher-l-sveen\/\"><h2 class=\"t2-post-title wp-block-t2-post-title\">Christopher L. Sveen<\/h2><\/a>\n\t<div class=\"taxonomy-role wp-block-post-terms\"><a href=\"https:\/\/haavind.stage01.dekodes.no\/en\/role\/partner\/\" rel=\"tag\">Partner<\/a><\/div>\n\t<div class=\"card-info wp-block-t2-people-meta\"><div class=\"card-info__post-meta meta-key-people_email\"><a href=\"mailto:c.sveen@haavind.stage01.dekodes.no\">c.sveen@haavind.stage01.dekodes.no<\/a><\/div><div class=\"card-info__post-meta meta-key-people_phone\"><a href=\"tel:+47 916 00 342\">+47 916 00 342<\/a><\/div><\/div>\n<\/div>\n\n<\/div><\/div>\t\t<\/div>\n\t\t\t<\/div>\n\t","protected":false},"excerpt":{"rendered":"<p>Offshore wind licenses representing approx. 1% of Norwegian ocean waters, or 30\u00a0000 MW will be awarded within 2040 announced the Norwegian government in a press conference May 11th. This goal represents nearly a doubling of Norway\u2019s total current renewable energy production and is far beyond the levels of ambitions previously stated by the Government.<\/p>\n","protected":false},"author":1,"featured_media":1789,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"sector":[12],"speciality":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.2 (Yoast SEO v24.2) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Norway sets ambitious goals for offshore wind - Haavind EN<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Norway sets ambitious goals for offshore wind\" \/>\n<meta property=\"og:description\" content=\"Offshore wind licenses representing approx. 1% of Norwegian ocean waters, or 30\u00a0000 MW will be awarded within 2040 announced the Norwegian government in a press conference May 11th. This goal represents nearly a doubling of Norway\u2019s total current renewable energy production and is far beyond the levels of ambitions previously stated by the Government.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/\" \/>\n<meta property=\"og:site_name\" content=\"Haavind EN\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-12T14:57:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-07-21T12:50:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1366\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"dekode\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"dekode\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/\",\"url\":\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/\",\"name\":\"Norway sets ambitious goals for offshore wind - Haavind EN\",\"isPartOf\":{\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg\",\"datePublished\":\"2022-05-12T14:57:26+00:00\",\"dateModified\":\"2022-07-21T12:50:44+00:00\",\"author\":{\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/#\/schema\/person\/320b2595d0720431b35a5792890609d9\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/#primaryimage\",\"url\":\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg\",\"contentUrl\":\"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg\",\"width\":1366,\"height\":768,\"caption\":\"Row of offshore wind turbines.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/#website\",\"url\":\"https:\/\/haavind.stage01.dekodes.no\/en\/\",\"name\":\"Haavind EN\",\"description\":\"-\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/haavind.stage01.dekodes.no\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/#\/schema\/person\/320b2595d0720431b35a5792890609d9\",\"name\":\"dekode\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/haavind.stage01.dekodes.no\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7a5d3b1cd78d3249eb55ea266048d444?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7a5d3b1cd78d3249eb55ea266048d444?s=96&d=mm&r=g\",\"caption\":\"dekode\"},\"sameAs\":[\"https:\/\/haavind.no\/wp\"],\"url\":\"https:\/\/haavind.stage01.dekodes.no\/en\/author\/dekode\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Norway sets ambitious goals for offshore wind - Haavind EN","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/","og_locale":"en_US","og_type":"article","og_title":"Norway sets ambitious goals for offshore wind","og_description":"Offshore wind licenses representing approx. 1% of Norwegian ocean waters, or 30\u00a0000 MW will be awarded within 2040 announced the Norwegian government in a press conference May 11th. This goal represents nearly a doubling of Norway\u2019s total current renewable energy production and is far beyond the levels of ambitions previously stated by the Government.","og_url":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/","og_site_name":"Haavind EN","article_published_time":"2022-05-12T14:57:26+00:00","article_modified_time":"2022-07-21T12:50:44+00:00","og_image":[{"width":1366,"height":768,"url":"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg","type":"image\/jpeg"}],"author":"dekode","twitter_card":"summary_large_image","twitter_misc":{"Written by":"dekode","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/","url":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/","name":"Norway sets ambitious goals for offshore wind - Haavind EN","isPartOf":{"@id":"https:\/\/haavind.stage01.dekodes.no\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/#primaryimage"},"image":{"@id":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/#primaryimage"},"thumbnailUrl":"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg","datePublished":"2022-05-12T14:57:26+00:00","dateModified":"2022-07-21T12:50:44+00:00","author":{"@id":"https:\/\/haavind.stage01.dekodes.no\/en\/#\/schema\/person\/320b2595d0720431b35a5792890609d9"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/haavind.stage01.dekodes.no\/en\/norway-sets-ambitious-goals-for-offshore-wind\/#primaryimage","url":"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg","contentUrl":"https:\/\/haavind.stage01.dekodes.no\/content\/uploads\/sites\/2\/2022\/06\/Offshore-wind.jpg","width":1366,"height":768,"caption":"Row of offshore wind turbines."},{"@type":"WebSite","@id":"https:\/\/haavind.stage01.dekodes.no\/en\/#website","url":"https:\/\/haavind.stage01.dekodes.no\/en\/","name":"Haavind EN","description":"-","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/haavind.stage01.dekodes.no\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/haavind.stage01.dekodes.no\/en\/#\/schema\/person\/320b2595d0720431b35a5792890609d9","name":"dekode","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/haavind.stage01.dekodes.no\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7a5d3b1cd78d3249eb55ea266048d444?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7a5d3b1cd78d3249eb55ea266048d444?s=96&d=mm&r=g","caption":"dekode"},"sameAs":["https:\/\/haavind.no\/wp"],"url":"https:\/\/haavind.stage01.dekodes.no\/en\/author\/dekode\/"}]}},"_links":{"self":[{"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/posts\/1105"}],"collection":[{"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/comments?post=1105"}],"version-history":[{"count":3,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/posts\/1105\/revisions"}],"predecessor-version":[{"id":5958,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/posts\/1105\/revisions\/5958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/media\/1789"}],"wp:attachment":[{"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/media?parent=1105"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/categories?post=1105"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/tags?post=1105"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/sector?post=1105"},{"taxonomy":"speciality","embeddable":true,"href":"https:\/\/haavind.stage01.dekodes.no\/en\/wp-json\/wp\/v2\/speciality?post=1105"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}